TAM-1 Cable System Pre-Laid Shore End landing in Puerto Rico for IT
Executed the installation of a 3 km Pre-Laid Shore End (PLSE) in San Juan for the TAM-1 submarine fiber optic cable system. Scope included 220 m of Horizontal Directional Drill (HDD) pull-in, installation of articulated pipe protection, and precision commercial diving operations to deliver a secure and resilient shore-end cable landing in challenging coastal conditions.